# Switchboard upgrade cost in Brisbane and Logan (2026 prices)

> Switchboard upgrade cost in Brisbane and Logan: from $1,850 including GST for a full upgrade. Smaller jobs, what is included and what changes the quote.

Source: https://www.fazeelectrical.com.au/switchboard-upgrade-cost/
Business: Faze Electrical & Airconditioning, Office 2/170-174 North Rd, Woodridge QLD 4114, Australia. Phone 07 4428 2766. Text 0489 275 747. QLD Electrical Contractor Licence 90552. ARCtick L181564.

By the Faze Electrical & Airconditioning team, Woodridge. Published 2 June 2026.

**Want a fixed price for your switchboard?** Text us your suburb and what the board has now: fuses, circuit breakers or safety switches. Our automated quote assistant replies straight away, at any hour.

[Get an instant price & book online](https://www.fazeelectrical.com.au/book-online/) Call 07 4428 2766

**A full single phase switchboard upgrade costs from $1,850 including GST with Faze Electrical & Airconditioning.** Smaller jobs cost less. Replacing a fuse with a circuit breaker starts from $250, and adding one safety switch to an existing board starts from $385. Your final price depends on the number of circuits and the condition of the board. Every quote is a fixed price in writing.

The quick answer

- A full single phase switchboard upgrade costs from $1,850 including GST.

- Smaller jobs cost less. Replacing a fuse with a circuit breaker starts from $250, and adding one safety switch starts from $385.

- The number of circuits is the main factor in the price.

- A safety switch protects people. A circuit breaker protects the wiring.

- A residential safety audit from $295 including GST checks the board and the wiring before you decide.

### How much does a switchboard upgrade cost in Brisbane and Logan?

The cost of an electrical switchboard upgrade depends on which job your switchboard needs. These are our starting prices for the three most common jobs, from one circuit to the whole board.

**From $250**to replace a fuse with a circuit breaker

**From $385**to add a single safety switch

**From $1,850**for a full single phase switchboard upgrade

Faze switchboard prices, including GST, checked 4 October 2026

| Job | What it covers | Price including GST |
| --- | --- | --- |
| Replace a fuse with a circuit breaker | One circuit on an existing board | from $250 |
| Add a single safety switch | One safety switch fitted to an existing board | from $385 |
| Full single phase switchboard upgrade | The whole board replaced | from $1,850 |
| Residential safety audit | A check of the board and the wiring before you decide | from $295 |

Each price is a starting price. A three phase upgrade is quoted on request, because the work depends on the supply to the property. The full list is on our [pricing page](https://www.fazeelectrical.com.au/pricing/).

 Inside a new switchboard. In a full upgrade, each circuit gets a correctly rated circuit breaker and a label.

### Work out which job your switchboard needs

The job depends on what the board has now and what you want it to do. Four situations cover most homes.

| Your situation | What it means |
| --- | --- |
| The board has ceramic fuses | The Electrical Safety Office describes these as ceramic plug in units with a length of fuse wire. A board like this can have single fuses replaced with circuit breakers, or be replaced in full. |
| The board has circuit breakers but few safety switches | Safety switches can often be added to the existing board. |
| You’re adding a large new load | An EV charger, an induction cooktop or a new air conditioner may need more room on the board. |
| The board shows heat damage | Browning around the terminals, melted plastic and scorch marks are signs to stop using the circuit and call an electrician. |

**Don’t remove any covers to take a photo.** A photo of the switchboard with its door open helps us tell you which job it is.

### What’s included in a full switchboard upgrade

A full upgrade replaces the old board with a new one that has a safety switch on every circuit. Our [switchboard upgrade Brisbane](https://www.fazeelectrical.com.au/switchboard-upgrade-cost/) page lists the full scope.

**A full upgrade includes**

- Removal of the old board, fuses and breakers.

- A new main switch.

- Safety switches on every circuit.

- A correctly rated circuit breaker for each circuit.

- Labels on every circuit.

- Testing of every circuit.

- Coordination with Energex where the supply is involved.

- A certificate of testing and compliance when the work is finished.

- A 12 month workmanship warranty.

[Get an instant price & book online](https://www.fazeelectrical.com.au/book-online/) Call 07 4428 2766

### What changes the price of a switchboard upgrade?

The number of circuits is the main factor, because each circuit needs its own safety switch and circuit breaker. Three other things affect the quote.

| What we look at | How it affects the quote |
| --- | --- |
| The age of the board | The Queensland Government states that switchboard panels and meter boards built or imported before 1 January 2004 may contain asbestos. It also states that most switchboards installed before 1990 are very likely to contain it. |
| The location of the board | An outdoor board needs a weather tight enclosure. |
| The supply | Work that involves the meter or the supply is coordinated with Energex. |

The asbestos information comes from the Queensland Government page on [electrical switchboards and meters](https://www.asbestos.qld.gov.au/know-where-asbestos/electrical-switchboards-and-meters). That page also says you can’t tell whether a panel contains asbestos by looking at it.

So tell us the age of the home when you ask for a quote.

### The difference between a safety switch and a circuit breaker

A safety switch protects people and a circuit breaker protects the wiring.

How the Electrical Safety Office explains the two

| On the board | What the Electrical Safety Office says it does |
| --- | --- |
| Safety switch | Turns off the electricity within milliseconds when it detects a current leak. |
| Circuit breakers and fuses | Protect the circuitry. |

The Electrical Safety Office recommends that you consider having safety switches installed on all circuits, whether you own or rent. It also says safety switches should be tested every three months. The source is its page on [safety switches](https://www.electricalsafety.qld.gov.au/electrical-safety-home/safety-switches).

**Does your board have safety switches?**

Look for a button marked T or test on the switchboard. A switch with no test button isn’t a safety switch.

Our [safety switch installation page](https://www.fazeelectrical.com.au/safety-switch-installation-brisbane/) covers adding them to an existing board. A [residential safety audit](https://www.fazeelectrical.com.au/safety-audits/) from $295 including GST checks the board and the wiring.

### Can you upgrade a switchboard yourself?

**No. Work on a switchboard is electrical work.** In Queensland electrical work must be done by a licensed electrician.

 The Electrical Safety Office says to use only a licensed electrician to add safety switches to a switchboard.

We’re licensed [Logan electricians](https://www.fazeelectrical.com.au/) based in Woodridge, and we work across Logan, Brisbane southside, Ipswich and the northern Gold Coast. Our licence number is 90552.

You can check any electrical contractor licence on the [Electrical Safety Office licence search](https://rapid.appianportals.com/public_licence_search).

### Four things to check before you book a switchboard upgrade

Ask these four questions before you accept a quote, ours included.

- Is the price fixed and in writing, and does it include GST?

- Will every circuit have a safety switch?

- Will you give me the certificate of testing and compliance when the work is finished?

- What’s your licence number? Then check it on the licence search.

### Common questions about switchboard upgrade costs

#### Is the quote free?

Yes. The written quote is free, and the quoted price is the invoiced price.

#### Do I need an upgrade before an EV charger or a new air conditioner?

It depends on the room and the capacity of the board. We check the switchboard when we quote an [EV charger installation](https://www.fazeelectrical.com.au/ev-charger-installation-cost/) or a split system, and we tell you before any work starts.

#### Will the power be off during the upgrade?

Yes. The power is off while the board is replaced. Every quote includes a time estimate, so you can plan around it.

Our advice

Find out which job your board needs before you book. A full upgrade starts from $1,850 including GST, but a board with circuit breakers and few safety switches can often have them added, and adding one starts from $385. Not sure which it is? Send us a photo of the board with its door open and the covers left on, or book a residential safety audit from $295 including GST.

Get a fixed price for your switchboard

Text us your suburb and what the board has now: fuses, circuit breakers or safety switches. Our automated quote assistant replies straight away, at any hour.

[Get an instant price & book online](https://www.fazeelectrical.com.au/book-online/) Call 07 4428 2766

Calls are answered Monday to Friday, 7am to 3:30pm. Or [send the details online](https://www.fazeelectrical.com.au/contact/).

Prices current as of 4 October 2026 and include GST. Sources: Electrical Safety Office, “Safety switches” and “Re-wiring fuses”; Queensland Government, “Electrical switchboards and meters”. This article is general information for Queensland homes. It is not advice about your property.

### Related guides

[No power after a storm in Brisbane? What to check before you call an electrician](https://www.fazeelectrical.com.au/storm-season-power-outage-brisbane/)[How much does it cost to install a power point in Brisbane? (2026 prices)](https://www.fazeelectrical.com.au/cost-to-install-power-point/)[How to Reset a Tripped Circuit Breaker: A Safe Step-by-Step Guide](https://www.fazeelectrical.com.au/how-to-reset-a-tripped-circuit-breaker/)

- [What Is a Switchboard Upgrade? Australian Home Guide](https://www.fazeelectrical.com.au/what-is-a-switchboard-upgrade/)
- [10 Signs You Need to Rewire Your House](https://www.fazeelectrical.com.au/signs-you-need-to-rewire-your-house/)

All guides: [electrical and air conditioning guides](https://www.fazeelectrical.com.au/guides/).

Written by the Faze Electrical & Airconditioning team, Woodridge

Licensed electricians and ARCtick refrigeration technicians, Queensland Electrical Contractor Licence 90552 and ARCtick L181564. We install and service split systems and do the electrical across Logan, Brisbane southside, Ipswich and the northern Gold Coast.

[About Faze](https://www.fazeelectrical.com.au/about/) | Call 07 4428 2766 | Text 0489 275 747

Get an instant price and book online, any hour

Split system installs, servicing and repairs are priced and booked online in a few minutes, with a 30% deposit now and the balance on the day. For electrical work, book a $50 on-site quote visit, credited to the job if you go ahead.

[Get an instant price & book online](https://www.fazeelectrical.com.au/book-online/) Call 07 4428 2766

Prices come from our current price list. Every booking has a 2 hour arrival window.
