Need a charger approved and installed? Book a $50 on-site quote visit online at any hour, credited to the job if you go ahead. We check the supply, the switchboard and the bay, then write the proposal the committee or the landlord needs.

Book a $50 quote visit online Call 07 4428 2766

The Faze team with two vans, two electricians carrying cable and conduit run along a warehouse wall

EV charger installation is possible in Brisbane apartments and workplace car parks: with Faze a single phase 7.4 kW charger you supply starts from $1,650 installed, and a single commercial charger from $2,450. The difference from a house is who says yes. In a unit block the charger connects to common property, so the body corporate approves it before anyone drills a hole. We prepare that proposal with you.

The quick answer

  • A charger in a unit car space costs from $1,650 with a charger you supply, or from $1,950 for a Tesla Wall Connector with the charger included.
  • Workplace and fleet charging starts from $2,450 per commercial charger, with load management so the building’s main switch never trips.
  • In Queensland a charger on common property is an improvement the body corporate must approve. There’s no right to charge law, so the proposal has to answer the committee’s questions first.
  • Most commercial buildings already have three phase power. Where a tenancy doesn’t, three phase installation starts from $1,200.
  • Every install comes with a certificate of testing and compliance and a 12 month workmanship warranty.

Can you put an EV charger in a Brisbane apartment?

You can, and there are two ways to do it. One owner installs a charger in their own bay and pays for their own power. Or the building sets up a shared scheme with a bank of chargers and a billing system, and owners buy into it. Both start with the same question: does the building’s supply have the capacity, and who approves the work?

In Queensland a charger that connects to common property is an improvement under the Body Corporate and Community Management Act 1997. The committee can approve a small improvement on its own. Anything larger, and any shared charging scheme, goes to a general meeting and is decided by ordinary resolution. Unlike New South Wales, there’s no deemed approval and no right to charge law here, so a request that arrives without answers tends to stall.

A proposal that gets a yes answers the questions before they’re asked. Here’s what ours contains.

  • A capacity assessment of the building’s main switchboard and incoming supply.
  • A load management design that guarantees the building’s own loads are never at risk.
  • Metering and billing through an OCPP platform, so each owner pays for their own energy.
  • A by law ready allocation of bays.
  • Staged pricing, from a single owner’s charger through to the whole car park.
A meter board with electricity meters and fuses for several units
In a unit block the charger’s circuit usually starts at the common meter board, which is why the body corporate has to approve it.

What EV charger installation costs in a unit or a workplace

The prices below are starting points for a bay or a tenancy where the existing supply has the capacity. The cable run from the switchboard to the bay, any switchboard work, load management hardware and the number of chargers are what move the final figure, and we tell you which before you agree to anything. Our EV charger installation cost guide covers the home version in detail.

Faze EV charger installation prices, 1 November 2026
Install From, including GST
Single phase 7.4 kW charger, you supply the charger $1,650
Tesla Wall Connector, single phase, charger included $1,950
Tesla Wall Connector on an existing three phase supply $2,650
Three phase upgrade plus EV charger, home $4,800
Single commercial EV charger $2,450
Three phase installation, commercial tenancy $1,200

Every quote is a fixed price in writing. If we hit something unforeseen once the work starts, we ring you before we go on.

Book a $50 quote visit online Call 07 4428 2766

Workplace and fleet charging

A workplace car park has the same capacity question as a unit block, with one difference: the chargers all get plugged in at nine in the morning. That’s where load management earns its keep.

Dynamic load management meters the site’s incoming supply in real time and shares whatever capacity is spare across the connected chargers. A supply that would support two unmanaged 22 kW chargers can run eight managed ones, and the main switch never trips. Billing runs through the same OCPP platform, so staff, fleet and visitor charging can each be charged differently, or not at all.

Our commercial EV charging page goes through staff, fleet and customer charging in more detail, and the wider scope sits with our commercial electricians in Brisbane, from switchboard upgrades to thermal imaging.

Commercial switchboards in a plant room
The capacity check starts in the plant room. What the main switchboard can carry decides how many chargers the site can run.

Does the building need three phase power?

Not always. A 7.4 kW single phase charger runs on a normal supply with its own dedicated circuit, and that’s the right answer for most owner chargers in a unit bay. The 11 kW and 22 kW chargers, and any site running more than two of them, need three phase.

Almost every commercial building already has three phase at the main switchboard. The gap turns up in tenancies, sheds and older shopfronts where only a single phase was ever brought to the tenancy board. For a home, a three phase upgrade plus the charger is from $4,800. For a commercial tenancy, three phase installation starts from $1,200, and our three phase power page explains what the upgrade involves.

How the job runs

  1. Quote visitWe check the supply, the switchboard and the bay, and the $50 visit is credited to the job if you go ahead.
  2. Proposal and approvalYou get a written fixed price and the proposal pack for the committee, the landlord or the property manager.
  3. Install and certifyDedicated circuit, charger, load management where it’s needed, testing, the certificate of compliance and the Energex notification.

Work is done by our own electricians under Queensland Electrical Contractor Licence 90552 across Logan, Brisbane southside, Ipswich and the northern Gold Coast.

Common questions about EV chargers in apartments and workplaces

Can the body corporate refuse my charger?

Yes. Queensland has no right to charge law, so approval is the committee’s or the general meeting’s to give. A proposal with a load assessment and a billing plan is what gets approved, because it answers the two things a committee worries about: the building’s supply and who pays.

Who pays for the electricity?

Each owner pays for their own. The chargers are metered through an OCPP platform, and the building can set its own rate for visitor or fleet charging if it wants to.

Can I charge from a normal power point in my bay?

It’s slow, and a standard power point circuit was never sized to carry a full load for hours every night. In a shared car park it also raises the question of whose meter the power is coming off. A dedicated charger circuit answers both.

Do you install in Logan and Ipswich as well?

Yes. We’re based in Woodridge and cover Logan, Brisbane southside, Ipswich and the northern Gold Coast to Ormeau.

Our advice

Get the capacity check and the proposal done first. A body corporate says yes to a charger that comes with a load management plan and a billing method, and no to a charger that’s just a request. For a workplace, start with a managed pair of chargers and add bays as the fleet grows.

Get a fixed price for your EV charger

Book a $50 on-site quote visit, credited to the job if you go ahead. We check the supply and the switchboard, then put a fixed price and the approval pack in writing.

Book a $50 quote visit online Call 07 4428 2766

Calls are answered Monday to Friday, 7am to 3:30pm. Online booking is open at any hour. Or send the details online.

Prices current as of 1 November 2026 and include GST. Sources: the Faze Electrical & Airconditioning price list and commercial EV charging page; the Body Corporate and Community Management Act 1997 (Queensland). This article is general information. It is not advice about your building, which needs a capacity check before anything is quoted.

Seven members of the Faze team standing in front of two Faze vans

Written by the Faze Electrical & Airconditioning team, Woodridge

Licensed electricians and ARCtick refrigeration technicians, Queensland Electrical Contractor Licence 90552 and ARCtick L181564. We install and service split systems and do the electrical across Logan, Brisbane southside, Ipswich and the northern Gold Coast.

About Faze | Call 07 4428 2766 | Text 0489 275 747

Get an instant price and book online, any hour

Split system installs, servicing and repairs are priced and booked online in a few minutes, with a 30% deposit now and the balance on the day. For electrical work, book a $50 on-site quote visit, credited to the job if you go ahead.

Get an instant price & book online Call 07 4428 2766

Prices come from our current price list. Every booking has a 2 hour arrival window.