Not sure what your switchboard needs? Text us a photo of the board with the door open and your suburb. Our automated quote assistant replies straight away, at any hour.

A switchboard upgrade replaces an old switchboard, or the old parts inside it, with modern circuit breakers and safety switches. So what is a switchboard upgrade for? It’s for homes whose board still runs on ceramic fuses, has no safety switch on some circuits, or has no room left for a new circuit. A licensed electrician does the work and tests every circuit before handing it back.
The quick answer
- The upgrade swaps ceramic fuses for circuit breakers and adds safety switches to the circuits.
- Fuses and circuit breakers protect the wiring. Safety switches are the part that protects people from electric shock.
- Common reasons: ceramic fuses, circuits with no safety switch, repeated trips, heat or a burning smell, or no space for a new circuit.
- Faze’s full single phase switchboard upgrade is from $1,850. Smaller jobs start from $250.
What is a switchboard upgrade?
Your switchboard is where the power coming into the house is split into circuits: the lights, the power points, the oven, the hot water and so on. Each circuit has a device on the board that cuts the power when something goes wrong.
An upgrade brings those devices up to date. Here’s what usually changes.
| Part | Older board | After the upgrade |
|---|---|---|
| Circuit protection | Ceramic fuses with fuse wire | Circuit breakers |
| Shock protection | No safety switch, or one covering only some circuits | Safety switches on the circuits |
| Space | Full, with nowhere to add a circuit | Room for the circuits you need now |
| Labels | Missing or faded | Each circuit labelled |

Fuses protect the wiring. Safety switches protect people.
This is the part most people don’t know. A fuse or circuit breaker cuts the power when a circuit is overloaded or shorted, which protects the cable. It isn’t designed to stop an electric shock.
A safety switch is. The Electrical Safety Office says that only safety switches save lives, and that circuit breakers and surge protectors protect appliances, not people. That’s on its page about re-wiring fuses.
Our view: one safety switch isn’t enough. The Electrical Safety Office says one may not be enough and suggests having them on all circuits, on its safety switches page.
When does a home need one?
Have the board looked at if any of these is true.
- The board still has ceramic fuses.
- Some circuits, such as the lights or the oven, have no safety switch.
- A fuse blows or a breaker trips again and again.
- The board is warm, smells of burning or has scorch marks.
- You’re adding a new circuit, such as an EV charger or a new air conditioner, and there’s no space on the board.
- You’re renovating or extending.
Burning smell or scorch marks at the board? Don’t touch it. Call a licensed electrician straight away.

Not sure which applies to you? An electrical safety inspection from $295 checks the switchboard and tells you what it needs.
What happens during the upgrade
The job follows three stages.
- Inspect and quoteWe look at the board and the circuits, then give you a free fixed price in writing.
- ReplaceWith the power off, we replace the old board or its parts. Some older boards have a backing panel that contains asbestos, and we check for that first.
- Test and hand overEvery circuit and safety switch is tested and labelled. You get a certificate of testing and compliance.
The work carries a 12 month workmanship warranty. Our page on switchboard upgrade Brisbane sets out what’s included.
Get an instant price & book online Call 07 4428 2766
A full upgrade isn’t always the answer
Sometimes the board is fine apart from one thing. These are our published starting prices.
For what’s included at each price and what pushes it up, read our switchboard upgrade cost guide. Adding a single safety switch is covered on our safety switch installation Brisbane page.
Common questions about switchboard upgrades
Are ceramic fuses illegal?
Not in themselves. The Electrical Safety Office notes that older homes may still have them. The Electrical Safety Office’s advice is that if you don’t have a safety switch, you should have your electrician install one.
Can I upgrade the switchboard myself?
No. In Queensland, electrical work must be done by a licensed electrician, and the Electrical Safety Office says to never do your own electrical work. Our licence number is 90552.
How often should the safety switches be tested?
Every three months, says the Electrical Safety Office. You press the test button on each one. Our guide on how to test a safety switch shows you how.
Our advice
If your board still has ceramic fuses or any circuit without a safety switch, get it looked at. The fuses protect the wiring, but only a safety switch protects the people in the house.
Get a fixed price for your switchboard
Text us a photo of the board with the door open and your suburb. Our automated quote assistant replies straight away, at any hour.
Get an instant price & book online Call 07 4428 2766
Calls are answered Monday to Friday, 7am to 3:30pm. Or send the details online.
Prices current as of 5 October 2026. Sources: Queensland Government, Electrical Safety Office, “Re-wiring fuses”, “Safety switches” and “Don’t do your own electrical work”. This article is general information. It is not advice about your switchboard.

Licensed electricians and ARCtick refrigeration technicians, Queensland Electrical Contractor Licence 90552 and ARCtick L181564. We install and service split systems and do the electrical across Logan, Brisbane southside, Ipswich and the northern Gold Coast.
About Faze | Call 07 4428 2766 | Text 0489 275 747
Get an instant price and book online, any hour
Split system installs, servicing and repairs are priced and booked online in a few minutes, with a 30% deposit now and the balance on the day. For electrical work, book a $50 on-site quote visit, credited to the job if you go ahead.
Get an instant price & book online Call 07 4428 2766
Prices come from our current price list. Every booking has a 2 hour arrival window.



